Operating Wind FarmsBozyel Wind Farm78 MW · 26 turbines78 MW with 26 turbines in Ayvacık, Çanakkale; about 260 GWh a year.Kuzeyyel in numbers


1,9 TWh2025 annual generation
A wind farm is not a plot of land; it is a decades-long commitment
Kuzeyyel Enerji started in 2009 with a 54 MW first project near Çanakkale. Today we operate nine wind farms across the Aegean, Marmara and eastern Mediterranean, with a further 270 MW in development and construction. We manage the full life cycle, from wind measurement to decommissioning, with our own team.
- Average capacity factor of 36.7% (2025)
- Turbine availability of 98.2%
- Seasonal bird and bat monitoring at every site
Our Wind Farms
Operating Wind FarmsBozyel Wind Farm78 MW · 26 turbines78 MW with 26 turbines in Ayvacık, Çanakkale; about 260 GWh a year.
Operating Wind FarmsKırkayak Wind Farm60 MW · 20 turbines60 MW with 20 turbines in Bandırma, Balıkesir; close to our maintenance hub.
Operating Wind FarmsÇakmaktepe Wind Farm54 MW · 18 turbinesOur first wind farm: 54 MW with 18 turbines in Karaburun, Izmir, at a 40% capacity factor.
Operating Wind FarmsTaşoluk Wind Farm84 MW · 21 turbines84 MW with 21 turbines in Bahçe, Osmaniye; new-generation 4 MW turbines.
Operating Wind FarmsAksuyolu Wind Farm96 MW · 24 turbines96 MW with 24 turbines in Keşan, Edirne; the largest operating wind farm in the portfolio.
Wind Farms Under ConstructionKarataş Wind Farm120 MW · 24 turbines120 MW with 24 turbines in Gelibolu, Çanakkale; commissioning in Q1 2027.Wind farm map and offices
Dependable output from every turbine
High availability
With our own maintenance crews and local spare-part stores, turbines stay available above 98% year-round.
24/7 field control centre
SCADA data from all nine sites is monitored live in Çanakkale; faults reach response crews within minutes.
Operating in harmony with nature
We apply radar-assisted shutdowns during bird migration and activity-based curtailment for bats.
Local employment
71% of our site staff come from villages and districts around the wind farms.
Transparent reporting
We publish production, emissions, safety and community investment indicators every year with independent assurance.
See how much CO₂ your capacity avoids
Enter installed capacity and capacity factor to estimate annual generation, avoided CO₂, equivalent trees and households supplied.
- 01Enter or slide the values
- 02See the result instantly
- 03Turn the result into a quote in one click
CO₂ Savings Calculator
Enter a wind farm's installed capacity and capacity factor to see annual generation, avoided CO₂ and its tree, car and household equivalents.
Sustainability Indicators
Our 2025 environmental, social and governance indicators. Values come from the independently assured Sustainability Report; progress is measured against the annual target.
Business Lines
- 01Wind Farm DevelopmentSite selection, permits, EIA, grid connection and financing: we make a project investment-ready.

- 02Operations and MaintenanceA 24/7 control centre, predictive maintenance and our own technicians keep turbines running efficiently.

- 03Energy Trading and Corporate PPAWe supply industrial sites with long-term, price-fixed wind power backed by YEK-G certificates.

- 04Wind Measurement and Resource AssessmentWe collect wind data with masts and LiDAR and report energy yield forecasts as P50/P90.

- 05Hybrid Storage and RepoweringWe replace older turbines with new ones and add battery storage to wind farms.

- 06Environment and Community ManagementEcological monitoring, noise and shadow flicker management, and landowner and village relations programmes.

A wind project from measurement to operation
- 01
Wind measurement
At least 24 months of data is collected with 80-120 m masts and LiDAR.
- 02
Permitting and EIA
Licence, EIA, land and grid connection permits proceed with stakeholder consultation.
- 03
Construction and commissioning
Foundations, erection and grid connection are completed in 14 to 18 months.
- 04
Operation and maintenance
Predictive maintenance and 24/7 monitoring for 25+ years of efficient operation.
Sustainability and annual reports
Access our reports, technical documents and policies in one place.
Stakeholder Views
The five-year wind PPA with Kuzeyyel made our energy cost predictable. The monthly emissions statements are a real help in customer audits.
Haluk SavranProcurement Director, Anka ÇimentoMost of what was promised when the farm was built was delivered. A water tank came to the village and young people received vocational school scholarships. Our complaints really get a reply.
Zeynep AltuntaşVillage Head, BozyelThey met reporting and monitoring standards fully in the Karataş financing. An exemplary sponsor on environmental and social criteria.
Mert YavuzerSenior Lending Manager, Anatolia Development FundNews and Insights
20Oct2026SustainabilityDo wind turbines harm birds? How radar-assisted shutdown worksReducing bird collisions depends on sound site selection and radar systems that stop turbines at risky…
16Oct2026Industry AnalysisWind energy in Turkey in 2026: capacity, YEKDEM and the market outlookCapacity growth, YEKA auctions, the post-YEKDEM era and curtailment risk: what awaits investors in 2026.
12Oct2026Technical GuideWhat is a capacity factor? Why the gap between 40% and 33% is worth millionsThe capacity factor explains the link between a wind farm's nameplate power and its real output. How is it…
08Oct2026Corporate EnergyA PPA guide for companies: physical or virtual?What industrial buyers should consider when choosing a wind PPA: physical and virtual models, YEK-G…A landowner or a green power buyer?
Let us assess your windy land together, or supply your facility's electricity from wind.